CRITICAL POWER GENERATORS
Apple Cork Campus 2×2500kVA Generator System Deployment
2×2500kVA Generator System for Apple Cork
Delivery Date
2024
Size
2 x 2500 KVA
Team
Client:
Dornan Engineering
End User:
Apple Cork
Ireland
Total
€1M
Project Details
PSE delivered a mission-critical power upgrade for Apple’s Cork campus, including the installation of two 2500kVA generators to ensure uninterrupted operations.
Dornan partnered with PSE to deliver a mission-critical power infrastructure upgrade for Apple’s flagship campus in Cork, Ireland. With Apple’s operations demanding absolute reliability, PSE deployed a tailored solution featuring two 2500kVA diesel generators—ensuring uninterrupted power delivery even in the most demanding scenarios. This project was designed to meet Apple’s exacting standards for performance, safety, and sustainability.
Project Details
List of services delivered:
- Generators
- Uninterruptible Power Supplies (UPS)
- Battery Energy Storage Systems (BESS)