PSE delivered a mission-critical power upgrade for Apple’s Cork campus, including the installation of two 2500kVA generators to ensure uninterrupted operations.

Dornan partnered with PSE to deliver a mission-critical power infrastructure upgrade for Apple’s flagship campus in Cork, Ireland. With Apple’s operations demanding absolute reliability, PSE deployed a tailored solution featuring two 2500kVA diesel generators—ensuring uninterrupted power delivery even in the most demanding scenarios. This project was designed to meet Apple’s exacting standards for performance, safety, and sustainability.